1.2 MW Solar operating in San Luis Obispo, CA — California Independent System Operator
1.2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
35.3221, -120.7326
County
San Luis Obispo, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Ecoplexus, Inc | Ecoplexus | — |
| Owner(s) | Ecoplexus, Inc | — | — |
| Status | Operating | operating | — |
Camp San Luis Obispo is a solar photovoltaic power plant located in San Luis Obispo County, California. The plant has a total capacity of 1.2 MW and began operating in 2024. It is owned and operated by Ecoplexus, Inc. The plant utilizes a single generator and employs fixed-tilt solar tracking technology.
The plant's primary fuel source is solar energy. In its latest year of operation, Camp San Luis Obispo generated 158 MWh of electricity, resulting in a capacity factor of 1.5%. The plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. In terms of size, Camp San Luis Obispo ranks as the 700th largest solar plant in California out of 862, and 6146th nationally out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
12 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
0 MWh
Latest Month
158 MWh
Annual Generation
1.5%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Goldtree · 12 kV
Substation Distance
3.576 km
Operator
Pacific Gas and Electric Company
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
GOLDTREE_1_N002
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match