2 MW Solar operating in Napa, CA — California Independent System Operator
2 MW
Nameplate Capacity
2
Generators
units
Solar Photovoltaic
Technology
2020
Operating Since
Coordinates
38.2375, -122.2756
County
Napa, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Soscol Ferry Solar | Soscol Ferry Solar | — |
| Owner(s) | RP Napa Solar 2, LLC | RP Napa Solar 2 LLC [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as RP Napa Solar 2 LLC [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
Soscol Ferry Solar is a 2 MW solar photovoltaic power plant located in Napa County, California. The plant began operating in 2020 and is owned and operated by Soscol Ferry Solar. It consists of two generators utilizing single-axis tracking technology to maximize solar energy capture. The plant is interconnected to the California Independent System Operator (CAISO) balancing authority, within the Western Electricity Coordinating Council (WECC) NERC region.
In its most recent year of operation, Soscol Ferry Solar generated 4,811 MWh of electricity, achieving a capacity factor of 27.4%. Based on capacity, the plant ranks as the 532nd largest solar facility in California out of 862, and 5175th nationally out of 7108. The plant's primary fuel source is solar energy.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
12 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
193 MWh
Latest Month
4.8K MWh
Annual Generation
27.4%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Tulucay Substation · 230 kV
Substation Distance
1.319 km
Operator
Pacific Gas and Electric Company
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
TULUCAY_6_N001
Pricing Hub
TH_NP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match