100 MW BESS operating in Tarrant, TX — Electric Reliability Council of Texas, Inc.
100 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2021
Operating Since
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Chisholm Grid, LLC | — | — |
| Owner(s) | Chisholm Grid, LLC | — | — |
| Status | Operating | — | — |
The Chisholm Grid Energy Storage System is a 100 MW battery energy storage facility located in Tarrant County, Texas. The plant, which began operating in 2021, is owned and operated by Chisholm Grid, LLC. It is interconnected to the Electric Reliability Council of Texas (ERCOT) grid, within the Texas Reliability Entity (TRE) NERC region. The facility is ranked 214th out of 224 power plants in Texas and 498th out of 514 nationally.
The Chisholm Grid facility utilizes lithium-ion batteries (LIB) to provide 125 MWh of energy storage, equating to a duration of 1.25 hours at its full 100 MW capacity. The plant consists of a single generator using batteries as its primary fuel source (MWH).
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
138 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
0 MWh
Net Discharge
-5.4K MWh
Annual Net Energy
-0.6%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
No financial data available for this plant.
Market Position
ISO/RTO Market
ERCOT
LMP Node
CHISMGRD_RN
Pricing Hub
HB_NORTH
Secondary Zone
LZ_NORTH
Location Type
Resource Node
Node Source
Curated node match
Eolian monetizes its BESS grid connection for new Texas data center
Utility-scale storage has many physical assets. In a time of data center need, one huge one that's non-tangible is the grid interconnection.
A Texas data center will open sooner thanks to an offline grid battery
While Eolian makes important upgrades to a 100-megawatt battery, the company will lend that grid connection to help CyrusOne's data center...
CyrusOne partners with energy firm Eolian for Dallas data center
Data center operator CyrusOne is partnering with battery energy storage provider Eolian for a campus in Fort Worth, Texas.
Eolian and CyrusOne team up to deploy Texas data centre at site of 100MW BESS
CyrusOne and Eolian have announced the deployment of a 200MW data centre at a pre-existing grid-scale BESS site in Fort Worth, Texas, US.
Last updated 2026-03-26