201.3 MW Wind operating in Sherman, OR — Avangrid Renewables LLC
201.3 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2022
Operating Since
Coordinates
45.5295, -120.6942
County
Sherman, OR
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Avangrid Power LLC | Avangrid Renewables | — |
| Owner(s) | Avangrid Power LLC | Avangrid | — |
| Status | Operating | operating | — |
Golden Hill Wind is a 201.3 MW wind power plant located in Sherman County, Oregon. The facility began operating in 2022 and is owned and operated by Avangrid Power LLC, a subsidiary of Avangrid. It ranks as the 6th largest wind farm in Oregon (out of 17) and 277th nationally (out of 734). The plant consists of a single generator utilizing onshore wind turbine technology. The balancing authority is Avangrid Renewables LLC, and the plant operates within the Western Electricity Coordinating Council (WECC) NERC region.
The wind farm's turbines have a hub height of 85 meters and a rotor diameter of 116 meters. The turbines were manufactured by GE Wind, model GE2.5-116. In its most recent year of operation, Golden Hill Wind generated 610,921 MWh of electricity, achieving a capacity factor of 34.5%.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
Avangrid Renewables LLC
Grid Voltage
230 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
52.2K MWh
Latest Month
610.9K MWh
Annual Generation
34.5%
Capacity Factor
No financial data available for this plant.
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.
Seeing double the solar installations in Oregon | Projects Weekly
Avangrid has energized two solar projects in Wasco County, Oregon, totaling 200 MWac. Plus, Zelestra has expanded its relationship with Meta...
Government rejects plans for huge wind turbines in Southern Uplands
Developers wanted to build 60 turbines up to 250m (820ft) tall near Moffat, which drew objections from the local community.
Golden eagle project renews calls to reject wind farm
A project to boost golden eagle numbers in southern Scotland has renewed its calls for a wind farm to be rejected due to concerns over the...
“We have the best site:” Contracts for Australia’s biggest wind project put out to tender
Origin says tenders are out for the turbine supply and balance of plant contracts for Australia's biggest wind project, likely to cost...
Last updated 2026-03-26