2 MW Solar operating in Wicomico, MD — PJM Interconnection, LLC
2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2019
Operating Since
Coordinates
38.4124, -75.6898
County
Wicomico, MD
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Tesla Inc. | Tesla | — |
| Owner(s) | Solar Integrated Fund VI, LLC | Solar Integrated Fund VI LLC [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as Solar Integrated Fund VI LLC [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
The Wor-Wic Community College - Offsite solar photovoltaic plant is located in Wicomico County, Maryland. The plant has a total capacity of 2 MW and began operating in 2019. It is owned and operated by Tesla Inc. The facility consists of a single generator and utilizes fixed-tilt solar tracking.
The plant's primary fuel source is solar energy. In its latest year of reported generation, the plant produced 3,615 MWh of electricity, achieving a capacity factor of 20.6%. The Wor-Wic Community College - Offsite plant operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. It is ranked as the 117th largest power plant in Maryland out of 183 plants, and 5162nd nationally out of 7108 plants.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
36.6 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
212 MWh
Latest Month
3.6K MWh
Annual Generation
20.6%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Hebron Substation · 69 kV
Substation Distance
1.337 km
Operator
Delmarva Power
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
HEBRON 69 KV LOAD 1
Pricing Hub
WESTERN HUB
Location Type
Load Node
Node Source
Curated node match
Report: Tesla is secretly building a giant 100 MW battery in Texas
A Tesla Inc. subsidiary registered as Gambit Energy Storage LLC is quietly building a more than 100 megawatt energy storage project in Angleton, Texas.
Silicon Valley may be powered using giant lithium-ion batteries under new projects to switch away from fossil fuels
California utility PG&E Corp. has proposed using giant lithium-ion batteries, including packs supplied by Tesla Inc., to supply power to...
Last updated 2026-03-26
View all articles