2 MW Batteries (1 MW) + Solar Photovoltaic (1 MW) under construction in Plymouth, MA — ISO New England Inc.
2 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
—
Operating Since
Coordinates
41.8421, -70.7699
County
Plymouth, MA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Solar Carver 3, LLC | Solar Carver 3 | — |
| Owner(s) | Solar Carver 3, LLC | — | — |
| Status | Under construction | construction | — |
Solar Carver 3 Hybrid is a 2 MW hybrid power plant located in Plymouth County, Massachusetts. The facility is owned and operated by Solar Carver 3, LLC. The plant utilizes both solar photovoltaic and battery storage technologies, with MWH listed as the primary fuel type. The solar array employs a fixed tilt tracking system.
The plant consists of two generators and operates within the ISO New England Inc. balancing authority and the NPCC NERC region. In terms of size, Solar Carver 3 Hybrid ranks as the 107th largest plant in Massachusetts out of 126, and nationally it is ranked 1117 out of 1205.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
ISO New England Inc.
Grid Voltage
22.8 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
SEMASS Tap Substation · 115 kV
Substation Distance
4.164 km
Operator
Eversource
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
UN.SEMASS 13.8SEM1
Pricing Hub
.H.INTERNAL_HUB
Node Source
Curated node match