10 MW Solar operating in Williamsburg, SC — Duke Energy Progress East
10 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2019
Operating Since
Coordinates
33.7636, -79.4569
County
Williamsburg, SC
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | CBH Lessor LLC | CBH Lessor | — |
| Owner(s) | CBH Lessor LLC | — | — |
| Status | Operating | operating | — |
Cherry Blossom Solar LLC is a 10 MW solar photovoltaic power plant located in Williamsburg County, South Carolina. The plant began operating in 2019 and has one generator. It is owned and operated by CBH Lessor LLC. The primary fuel source is solar energy. The plant utilizes single-axis tracking technology to maximize solar energy capture. Cherry Blossom Solar is ranked 57th out of 143 solar plants in South Carolina, and 1815th nationally out of 7108 plants.
In its most recent year of operation, Cherry Blossom Solar generated 18,727 MWh of electricity, resulting in a capacity factor of 21.3%. The plant operates within the Duke Energy Progress East balancing authority and is part of the SERC NERC region. Financial data indicates that the plant's installed cost and PPA price are tracked by Lawrence Berkeley National Laboratory (LBNL) solar data.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Duke Energy Progress East
Grid Voltage
22.86 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
1.1K MWh
Latest Month
18.7K MWh
Annual Generation
21.3%
Capacity Factor
$35.4/MWh
LCOE (Levelized Cost)
$20.7/MWh
Energy Value
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.