4.5 MW Solar operating in Los Angeles, CA — California Independent System Operator
4.5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2014
Operating Since
Coordinates
34.4333, -118.5108
County
Los Angeles, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | SCV Water | MN8 Energy | — |
| Owner(s) | SCV Water | — | — |
| Status | Operating | operating | — |
The SCV Water - Gladbach Water Treatment Plant Phases I and II is a 4.5 MW solar photovoltaic facility located in Los Angeles County, California. The plant began operating in 2014 and is owned and operated by SCV Water. It utilizes single-axis tracking technology to maximize solar energy capture. The plant is interconnected to the California Independent System Operator (CAISO) grid and falls within the Western Electricity Coordinating Council (WECC) NERC region.
In the most recent year of data, the plant generated 5,046 MWh of electricity, resulting in a capacity factor of 12.8%. The facility is ranked as the 322nd largest solar plant in California out of 862, and 3264th nationally out of 7108. The plant has one generator and its primary fuel source is solar.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
27 kV
Regulatory Status
NR
Entity Type
Municipal
Sector
Commercial Non-CHP
88 MWh
Latest Month
5.0K MWh
Annual Generation
12.8%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
CAISO
LMP Node
—
Pricing Hub
TH_SP15_GEN-APND
Node Source
OSM spatial match