93 MW Wind operating in Marshall, IL — Midcontinent Independent Transmission System Operator, Inc..
93 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2021
Operating Since
Coordinates
40.9614, -89.0821
County
Marshall, IL
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Minonk Stewardship Wind LLC | Akuo Energy SAS [100%] | — |
| Owner(s) | Minonk Stewardship Wind LLC | Ardian France | — |
| Status | Operating | operating | — |
Bennington Wind is a 93 MW wind power plant located in Marshall County, Illinois. The facility began operating in 2021 and is owned by Ardian France, with Minonk Stewardship Wind LLC as the listed operator per the EIA. The plant utilizes a single generator consisting of multiple onshore wind turbines. The turbines are manufactured by GE Wind, model GE2.82-127, with a hub height of 89 meters and a rotor diameter of 127 meters.
In its most recent year of operation, Bennington Wind generated 303,934 MWh of electricity, achieving a capacity factor of 37.4%. The plant is connected to the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority, within the SERC NERC region. Bennington Wind ranks as the 46th largest wind farm in Illinois out of 59, and 775th nationally out of 1424.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
138 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
34.2K MWh
Latest Month
303.9K MWh
Annual Generation
37.4%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
MISO
LMP Node
AMIL.BENGTNWD
Pricing Hub
ILLINOIS.HUB
Location Type
Generation Node
Node Source
Curated node match