1.2 MW Solar operating in San Bernardino, CA — California Independent System Operator
1.2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2015
Operating Since
Coordinates
34.5790, -117.5793
County
San Bernardino, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Phelan Pinon Hills Community Services District | Phelan Pinon Hills Community Services District | — |
| Owner(s) | Phelan Pinon Hills Community Services District | — | — |
| Status | Operating | operating | — |
Phelan Pinon Hills CSD Solar is a 1.2 MW solar photovoltaic power plant located in San Bernardino County, California. The plant began operating in 2015 and is owned and operated by the Phelan Pinon Hills Community Services District. It consists of a single generator utilizing single-axis tracking technology to maximize solar energy capture.
The plant's latest annual generation was 2,514 MWh, achieving a capacity factor of 23.9%. Phelan Pinon Hills CSD Solar operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. In terms of size, the plant is ranked 718 out of 862 solar facilities in California, and 6173 out of 7108 nationally.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
115 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
0 MWh
Latest Month
2.5K MWh
Annual Generation
23.9%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
CAISO
LMP Node
RDWAY_7_N002
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match