1 MW Solar operating in San Joaquin, CA — California Independent System Operator
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2018
Operating Since
Coordinates
37.7348, -121.5090
County
San Joaquin, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Powerflex | EnterSolar | — |
| Owner(s) | Medline Industries Inc. | Medline Industries Inc. [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as Medline Industries Inc. [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
Medline Ind. Phase 2 Tracy is a 1 MW solar photovoltaic power plant located in San Joaquin County, California. The plant began operating in 2018 and has one generator. It is owned and operated by Powerflex. The plant utilizes a fixed tilt solar tracking system.
The plant's primary fuel source is solar energy. In its most recent year of operation, Medline Ind. Phase 2 Tracy generated 1,976 MWh of electricity, achieving a capacity factor of 22.5%. The plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. Based on capacity, the plant ranks 834 out of 862 solar plants in California, and 7019 out of 7108 nationally.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
0.48 kV
Regulatory Status
NR
Entity Type
Commercial
Sector
IPP Non-CHP
72 MWh
Latest Month
2.0K MWh
Annual Generation
22.5%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Schulte Switching Station · 115 kV
Substation Distance
< 10 km
Operator
Pacific Gas and Electric Company
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
—
Pricing Hub
TH_NP15_GEN-APND
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.