2.2 MW Solar operating in Fresno, CA — California Independent System Operator
2.2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2018
Operating Since
Coordinates
36.7656, -119.7965
County
Fresno, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Forefront Power, LLC | Forefront Power | — |
| Owner(s) | Forefront Power, LLC | — | — |
| Status | Operating | operating | — |
The SCCCD - Fresno Community College solar photovoltaic plant is located in Fresno County, California. The plant, owned and operated by Forefront Power, LLC, has a total capacity of 2.2 MW. It commenced operations in 2018 and utilizes a fixed tilt solar tracking system. The plant is connected to the California Independent System Operator (CAISO) balancing authority within the Western Electricity Coordinating Council (WECC) NERC region.
In its most recent year of operation, the plant generated 2,824 MWh of electricity, achieving a capacity factor of 14.6%. The plant is ranked as the 497th largest solar facility in California out of 862, and 4498th nationally out of 7108. The facility consists of a single generator.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
21 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
102 MWh
Latest Month
2.8K MWh
Annual Generation
14.6%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
CAISO
LMP Node
PGF1_2_PDRP03-APND
Pricing Hub
TH_ZP26_GEN-APND
Location Type
Aggregated Node
Node Source
Curated node match