1 MW Solar operating in Douglas, MN — Midcontinent Independent Transmission System Operator, Inc..
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2020
Operating Since
Coordinates
45.8468, -95.1492
County
Douglas, MN
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | REA Investments, LLC | REA Investments | — |
| Owner(s) | REA Investments, LLC | — | — |
| Status | Operating | operating | — |
The Novel Herickhoff Solar CSG is a 1 MW solar photovoltaic power plant located in Douglas County, Minnesota. The plant began operating in 2020 and is owned and operated by REA Investments, LLC. It consists of a single generator utilizing fixed-tilt solar tracking technology. The plant's primary fuel source is solar energy.
In its most recent year of operation, the Novel Herickhoff Solar CSG generated 1,422 MWh of electricity, achieving a capacity factor of 16.3%. The plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority. In terms of size, the Novel Herickhoff Solar CSG ranks as the 286th largest power plant in Minnesota out of 540, and 6506th nationally out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
480 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
45 MWh
Latest Month
1.4K MWh
Annual Generation
16.3%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Douglas County Substation · 115 kV
Substation Distance
< 10 km
Operator
Xcel Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MINN.HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.