2 MW Solar operating in Worcester, MA — ISO New England Inc.
2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2018
Operating Since
Coordinates
42.6895, -72.0855
County
Worcester, MA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Onyx Asset Services Group | Onyx Asset Services Group | — |
| Owner(s) | Solar Mission SunE LLC | Solar Mission SunE LLC [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as Solar Mission SunE LLC [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
Winchendon Landfill Solar is a 2 MW solar photovoltaic power plant located in Worcester County, Massachusetts. The plant began operating in 2018 and has one generator. It is owned and operated by Onyx Asset Services Group. The plant's primary fuel source is solar energy. Winchendon Landfill Solar ranks 241st out of 435 power plants in Massachusetts and 4671st out of 7108 plants nationally.
The plant operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. In its latest year of reported generation, Winchendon Landfill Solar produced 2,752 MWh of electricity, achieving a capacity factor of 15.7%. The solar panels utilize a fixed-tilt tracking system.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
ISO New England Inc.
Grid Voltage
13.2 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
125 MWh
Latest Month
2.8K MWh
Annual Generation
15.7%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
East Winchendon Substation · 115 kV
Substation Distance
< 10 km
Operator
National Grid
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
—
Pricing Hub
.H.INTERNAL_HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.