5 MW Hydro planned in Panola, MS — Tennessee Valley Authority
5 MW
Nameplate Capacity
2
Generators
units
Conventional Hydroelectric
Technology
Planned: —
Planned Operation
Coordinates
34.1581, -89.9055
County
Panola, MS
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Rye Development | — | — |
| Owner(s) | Rye Development | — | — |
| Status | Planned | — | — |
The Enid Lake Hydroelectric Project is a 5 MW conventional hydroelectric power plant located in Panola County, Mississippi. It is owned and operated by Rye Development. The plant utilizes water (WAT) as its primary fuel source and consists of two generators.
The plant operates within the Tennessee Valley Authority balancing authority and the SERC NERC region. It is ranked as the 4th largest hydroelectric plant in Mississippi out of 4 such plants, and nationally it is ranked 881 out of 1464 hydroelectric facilities.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Tennessee Valley Authority
Grid Voltage
12.5 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.