57.6 MW Solar operating in Rich, UT — PacifiCorp - East
57.6 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2019
Operating Since
Coordinates
41.7685, -111.0618
County
Rich, UT
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | CI III VK I TE Partnership LLC | First Solar | — |
| Owner(s) | CI III VK I TE Partnership LLC | Copenhagen Infrastructure Partners Holding | — |
| Status | Operating | operating | — |
Sage Solar I-III is a 57.6 MW solar photovoltaic power plant located in Rich County, Utah. The plant began operating in 2019 and has one generator. It is owned by Copenhagen Infrastructure Partners Holding, a company based in Denmark, and operated by CI III VK I TE Partnership LLC. The facility utilizes single-axis tracking to maximize solar energy capture.
In its most recent year of operation, Sage Solar I-III generated 136,607 MWh of electricity, achieving a capacity factor of 27.0%. The plant operates within the PacifiCorp - East balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. Sage Solar I-III is ranked as the 27th largest solar plant in Utah out of 58, and 1074th nationally out of 7108. Financial data is available for the plant from LBNL, though specific figures are not provided.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
PacifiCorp - East
Grid Voltage
69 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
4.2K MWh
Latest Month
136.6K MWh
Annual Generation
27.0%
Capacity Factor
$41.8/MWh
LCOE (Levelized Cost)
$21.2/MWh
Energy Value
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.
Europeans break ground in Texas and Utah on 300 MW of solar power
Copenhagen Infrastructure Partners have started construction on their Misae and Sage solar power projects, located in Texas and Utah and sized 240 MW-AC and 58...
Europeans break ground in Texas and Utah on 300 MW of solar power
Copenhagen Infrastructure Partners have started construction on their Misae and Sage solar power projects, located in Texas and Utah and sized 240 MW-AC and 58...
Last updated 2026-03-14
View all articles