2.8 MW Hydro planned in Estill, KY — PJM Interconnection, LLC
2.8 MW
Nameplate Capacity
6
Generators
units
Conventional Hydroelectric
Technology
Planned: —
Planned Operation
Coordinates
37.7840, -84.1033
County
Estill, KY
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Lock 11 Hydro Partners, LLC | — | — |
| Owner(s) | Lock 11 Hydro Partners, LLC | — | — |
| Status | Planned | — | — |
The KY No. 11 L&D Hydroelectric Project is a 2.8 MW hydroelectric generating facility located in Estill County, Kentucky. The plant utilizes conventional hydroelectric technology and is powered by water (WAT). It consists of 6 generators. The facility is owned and operated by Lock 11 Hydro Partners, LLC.
The plant operates within the PJM Interconnection, LLC balancing authority and the SERC NERC region. It is ranked as the 10th largest hydroelectric plant out of 14 in the state of Kentucky, and 1119th out of 1464 nationally.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
15 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Market Position
ISO/RTO Market
PJM
LMP Node
—
Pricing Hub
AEP-DAYTON HUB
Node Source
OSM spatial match