12 MW Hydro planned in Greene, PA — PJM Interconnection, LLC
12 MW
Nameplate Capacity
2
Generators
units
Conventional Hydroelectric
Technology
Planned: —
Planned Operation
Coordinates
39.8237, -79.9230
County
Greene, PA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Rye Development | — | — |
| Owner(s) | Rye Development | — | — |
| Status | Planned | — | — |
The Grays Landing L&D Hydroelectric Project is a 12 MW hydroelectric power plant located in Greene County, Pennsylvania. The plant utilizes conventional hydroelectric technology and consists of two generators. It is owned and operated by Rye Development. The plant's primary fuel source is water (WAT).
Grays Landing operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. It is ranked as the 17th largest hydroelectric plant in Pennsylvania out of 28 such facilities, and ranks 619th nationally out of 1464 hydroelectric plants.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
69 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Market Position
ISO/RTO Market
PJM
LMP Node
LARDIN 138 KV T61
Pricing Hub
WESTERN HUB
Location Type
Load Node
Node Source
Curated node match