275 MW Batteries (75 MW) + Solar Photovoltaic (200 MW) operating in Clark, NV — Nevada Power Company
275 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
2023
Operating Since
Coordinates
36.5026, -114.8593
County
Clark, NV
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Arrow Canyon Solar LLC | EDF Renewables | — |
| Owner(s) | Arrow Canyon Solar LLC | EDF Renewables [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as EDF Renewables [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
Arrow Canyon Solar Hybrid is a 275 MW hybrid power plant located in Clark County, Nevada. The plant, which began operating in 2023, is owned and operated by Arrow Canyon Solar LLC. It utilizes both solar photovoltaic technology and battery energy storage. The facility consists of two generators and features dual-axis solar tracking. The battery energy storage system (BESS) has a capacity of 375 MWh, providing 5 hours of duration and employing lithium-ion battery (LIB) chemistry.
The plant's primary fuel source is electricity measured in MWh. In its latest year of operation, Arrow Canyon Solar Hybrid generated 595,106 MWh, resulting in a capacity factor of 24.7%. The plant operates within the Nevada Power Company balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. Arrow Canyon Solar Hybrid is ranked as the 10th largest solar facility out of 20 in Nevada, and 182nd out of 514 nationally. Financial data is available for the plant from LBNL, and the plant has been mentioned in 5 news articles related to industry, deals, and regulatory matters.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
Nevada Power Company
Grid Voltage
230 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
28.6K MWh
Latest Month
595.1K MWh
Annual Generation
24.7%
Capacity Factor
$11.4/MWh
Energy Value
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.
Super Bowl LVIII powered entirely by Nevada solar-plus-storage project
Super Bowl LVIII was powered entirely by renewable power, with an EDF Renewables solar-plus-storage project in Nevada meeting the energy demands of the final...
Super Bowl LVIII powered entirely by Nevada solar-plus-storage project
Super Bowl LVIII was powered entirely by renewable power, with an EDF Renewables solar-plus-storage project in Nevada meeting the energy demands of the final...
Super Bowl LVIII powered entirely by Nevada solar-plus-storage project
Super Bowl LVIII was powered entirely by renewable power, with an EDF Renewables solar-plus-storage project in Nevada meeting the energy demands of the final...
Super Bowl LVIII powered entirely by Nevada solar-plus-storage project
Super Bowl LVIII was powered entirely by renewable power, with an EDF Renewables solar-plus-storage project in Nevada meeting the energy demands of the final...
Last updated 2026-03-14
View all 10 articles