2.3 MW Solar operating in Yolo, CA — California Independent System Operator
2.3 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2018
Operating Since
Coordinates
38.6827, -121.7235
County
Yolo, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | MN8 Energy LLC | MN8 Energy | — |
| Owner(s) | SunTrust Equipment Finance & Leasing Corp | SunTrust Equipment Finance & Leasing Corp [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as SunTrust Equipment Finance & Leasing Corp [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
The Target Woodland Solar Project is a 2.3 MW solar photovoltaic power plant located in Yolo County, California. The plant began operating in 2018 and has one generator. MN8 Energy LLC is the plant's operator. As of the most recent data, the plant is ranked 488th out of 862 solar facilities in California and 4405th nationally out of 7108. The plant uses fixed tilt solar tracking technology.
The Target Woodland Solar Project operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. In its latest year of operation, the plant generated 2,889 MWh of electricity, achieving a capacity factor of 14.3%.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
0.48 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
107 MWh
Latest Month
2.9K MWh
Annual Generation
14.3%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Woodland Substation · 115 kV
Substation Distance
1.405 km
Operator
Pacific Gas and Electric Company
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
WOODLAND_7_B1
Pricing Hub
TH_NP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match