4 MW Solar operating in Hampshire, MA — ISO New England Inc.
4 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2019
Operating Since
Coordinates
42.4270, -72.7687
County
Hampshire, MA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | AES Distributed Energy | AES Distributed Energy | — |
| Owner(s) | AES Distributed Energy | — | — |
| Status | Operating | operating | — |
The Williamsburg solar photovoltaic plant is located in Hampshire County, Massachusetts. The plant has a total capacity of 4 MW and began operating in 2019. It consists of a single generator utilizing fixed-tilt solar tracking technology. The primary fuel source is solar energy (SUN). AES Distributed Energy is the plant's operator.
The Williamsburg plant is connected to the ISO New England Inc. balancing authority and operates within the NPCC NERC region. In its latest year of reported generation, the plant produced 6,620 MWh of electricity, achieving a capacity factor of 18.9%. The plant ranks 80th in size among 435 power plants in Massachusetts, and 3462nd nationally out of 7108 plants.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
ISO New England Inc.
Grid Voltage
13.8 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
330 MWh
Latest Month
6.6K MWh
Annual Generation
18.9%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
ISO-NE
LMP Node
—
Pricing Hub
.H.INTERNAL_HUB
Node Source
Plant coordinates only
Solar Farm Proposed Near Waller Mill Reservoir
WILLIAMSBURG — Williamsburg City Council heard a proposal from Cynergy Power for a solar farm near Waller Mill Reservoir — city-owned land...
Solar Farm Proposed Near Waller Mill Reservoir
WILLIAMSBURG — Williamsburg City Council heard a proposal from Cynergy Power for a solar farm near Waller Mill Reservoir — city-owned land...
A solar farm in Williamsburg? Leaders have concerns.
Cenergy Power is proposing to build a solar production and storage facility on 162.19 acres of land near Waller Miller Reservoir.
A solar farm in Williamsburg? Leaders have concerns.
Cenergy Power is proposing to build a solar production and storage facility on 162.19 acres of land near Waller Miller Reservoir.
Last updated 2026-03-26