50 MW Solar planned in Barnwell, SC — Dominion Energy South Carolina
50 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
Planned: —
Planned Operation
Coordinates
33.3689, -81.3650
County
Barnwell, SC
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Crossroads Solar | — | — |
| Owner(s) | Crossroads Solar | — | — |
| Status | Planned | pre-construction | — |
Crossroads Solar is a 50 MW solar photovoltaic power plant located in Barnwell County, South Carolina. The plant, owned and operated by Crossroads Solar, utilizes fixed-tilt solar tracking technology. It is the 32nd largest power plant in South Carolina out of 143, and ranks 1158th nationally among 7108 plants. The plant has one generator.
The facility operates within the Dominion Energy South Carolina balancing authority and is part of the SERC NERC region. Its primary fuel source is solar energy (SUN).
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Dominion Energy South Carolina
Grid Voltage
115 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.
Will Ohio make a $98 million mistake?
What's happening at the Ohio Power Siting Board (OPSB) should concern every Ohio leader who cares about the state's economic future.
Ohio Solar Project Denied: Crossroads Solar I Rejected by Siting Board - News and Statistics
Ohio regulators have denied the Crossroads Solar I project following substantial local opposition, raising concerns about the state's clean...
Ohio denies 94 MW Crossroads solar project
Ohio Power Siting Board denied the 94 MW Crossroads Solar project in Morrow County after revising staff recommendation amid local opposition...
Ohio Power Siting Board blocks construction of Morrow County solar farm
The Ohio Power Siting Board has denied construction of the Crossroads Solar project in Morrow County. The decision referenced “consistent...
Last updated 2026-03-14
View all 10 articles