3 MW Wind operating in Providence, RI — ISO New England Inc.
3 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2019
Operating Since
Coordinates
41.7935, -71.5307
County
Providence, RI
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | WED Plainfield III, LLC | — | — |
| Owner(s) | WED Plainfield III, LLC | — | — |
| Status | Operating | — | — |
WED Plainfield III, LLC is a 3 MW wind power plant located in Providence County, Rhode Island. The plant began operating in 2019 and is owned and operated by WED Plainfield III, LLC. It consists of a single onshore wind turbine. The plant is interconnected to the ISO New England Inc. balancing authority and is within the NPCC NERC region.
The facility utilizes a Vensys120 wind turbine, manufactured by Vensys, with a rotor diameter of 120 meters and a hub height of 98 meters. In its most recent year of operation, the plant generated 6,117 MWh of electricity, achieving a capacity factor of 23.2%. WED Plainfield III, LLC ranks as the 9th largest power plant in Rhode Island out of 20, and nationally it ranks 1270 out of 1424.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
ISO New England Inc.
Grid Voltage
23 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
555 MWh
Latest Month
6.1K MWh
Annual Generation
23.2%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Ridgewood Substation · 115 kV
Substation Distance
< 10 km
Operator
Rhode Island Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
—
Pricing Hub
.Z.RHODEISLAND
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.