1.1 MW Solar operating in Pima, AZ — Tucson Electric Power Company
1.1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2019
Operating Since
Coordinates
32.1659, -110.8178
County
Pima, AZ
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Tesla Inc. | Tesla | — |
| Owner(s) | Solar Integrated Fund IV-A, LLC | Solar Integrated Fund IV-A LLC [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as Solar Integrated Fund IV-A LLC [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
Pima Community College is a 1.1 MW solar photovoltaic power plant located in Pima County, Arizona. The plant began operating in 2019 and is owned and operated by Tesla Inc. It consists of a single generator utilizing fixed-tilt solar tracking technology. The plant's primary fuel source is solar energy (SUN).
In its most recent year of operation, the plant generated 788 MWh of electricity, resulting in a capacity factor of 8.2%. The plant operates within the Western Electricity Coordinating Council (WECC) NERC region, under the balancing authority of Tucson Electric Power Company. In terms of size, the Pima Community College plant ranks 85th out of 93 solar plants in Arizona, and 6255th out of 7108 plants nationally.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
Tucson Electric Power Company
Grid Voltage
36.6 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
0 MWh
Latest Month
788 MWh
Annual Generation
8.2%
Capacity Factor
No financial data available for this plant.
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.