3.7 MW Solar operating in Cuyahoga, OH — PJM Interconnection, LLC
3.7 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2018
Operating Since
Coordinates
41.4433, -81.7514
County
Cuyahoga, OH
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Madison Energy Holdings LLC | IOS II | — |
| Owner(s) | Madison Energy Holdings LLC | — | — |
| Status | Operating | operating | — |
The Cuyahoga County Landfill is a 3.7 MW solar photovoltaic power plant located in Cuyahoga County, Ohio. The plant began operating in 2018 and has a single generator. It is owned and operated by Madison Energy Holdings LLC. The plant's primary fuel source is solar energy.
The Cuyahoga County Landfill is interconnected to the grid and operates within the PJM Interconnection, LLC balancing authority, which falls under the RFC NERC region. In its most recent year of operation, the plant generated 4,256 MWh of electricity, achieving a capacity factor of 13.1%. The solar array uses a fixed tilt configuration. The plant is ranked as the 53rd largest solar facility in Ohio out of 84, and nationally it is ranked 3598 out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
13.8 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
134 MWh
Latest Month
4.3K MWh
Annual Generation
13.1%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Clinton/Graham/Grovewood Substation · 138 kV
Substation Distance
1.28 km
Operator
Illuminating Comapny
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
GROVEWD 36 KV LD3
Pricing Hub
AEP-DAYTON HUB
Location Type
Load Node
Node Source
Curated node match