99.4 MW Wind operating in Wilbarger, TX — Electric Reliability Council of Texas, Inc.
99.4 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2019
Operating Since
Coordinates
34.2259, -99.4780
County
Wilbarger, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Blue Summit II Wind, LLC | — | — |
| Owner(s) | Blue Summit II Wind, LLC | — | — |
| Status | Operating | — | — |
Blue Summit II Wind is a 99.4 MW wind power plant located in Wilbarger County, Texas. The facility began operating in 2019 and is owned and operated by Blue Summit II Wind, LLC. The plant consists of a single generator utilizing onshore wind turbine technology. It is interconnected to the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority.
The plant's latest annual generation was 346,902 MWh, resulting in a capacity factor of 39.8%. The wind turbines have a hub height of 90 meters and a rotor diameter of 116 meters. The turbines were manufactured by GE Wind, model GE2.5-116. Blue Summit II Wind ranks as the 202nd largest power plant in Texas out of 245, and 738th nationally out of 1424.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
345 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
38.5K MWh
Latest Month
346.9K MWh
Annual Generation
39.8%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Chillicothe Substation · 69 kV
Substation Distance
< 10 km
Operator
American Electric Power
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_NORTH
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
Last updated 2026-03-26