2 MW Solar operating in Clarendon, SC — Duke Energy Progress East
2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2018
Operating Since
Coordinates
33.6179, -80.3631
County
Clarendon, SC
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Altus Power America Management, LLC | Bond Solar | — |
| Owner(s) | Altus Power America Management, LLC | — | — |
| Status | Operating | operating | — |
Bond Solar is a 2 MW solar photovoltaic power plant located in Clarendon County, South Carolina. The plant began operating in 2018 and is owned and operated by Altus Power America Management, LLC. It utilizes a single-axis tracking system to maximize solar energy capture. The plant is interconnected with the Duke Energy Progress East balancing authority, within the SERC NERC region.
In its most recent year of operation, Bond Solar generated 3,320 MWh of electricity, achieving a capacity factor of 18.9%. Based on total capacity, the plant ranks 101st out of 143 solar facilities in South Carolina and 4919th out of 7108 solar facilities nationally. The plant consists of one generator using SUN as its primary fuel.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Duke Energy Progress East
Grid Voltage
22.86 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
167 MWh
Latest Month
3.3K MWh
Annual Generation
18.9%
Capacity Factor
No financial data available for this plant.
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.