2 MW Solar operating in Darlington, SC — Duke Energy Progress East
2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2021
Operating Since
Coordinates
34.3374, -80.0813
County
Darlington, SC
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | 1634 Solar, LLC | 1634 Solar | — |
| Owner(s) | Soltage LLC | Soltage LLC [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as Soltage LLC [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
1634 Solar is a 2 MW solar photovoltaic power plant located in Darlington County, South Carolina. The plant began operating in 2021 and is owned and operated by 1634 Solar, LLC. It consists of a single generator utilizing fixed-tilt solar tracking technology. The plant is interconnected to the Duke Energy Progress East balancing authority within the SERC NERC region.
In its most recent year of operation, 1634 Solar generated 4,225 MWh of electricity, achieving a capacity factor of 24.0%. The plant's capacity ranks it as the 102nd largest solar facility in South Carolina out of 143, and 4841st nationally out of 7108. The plant's primary fuel source is solar energy (SUN).
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Duke Energy Progress East
Grid Voltage
23 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
232 MWh
Latest Month
4.2K MWh
Annual Generation
24.0%
Capacity Factor
No financial data available for this plant.
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.