10 MW Solar operating in Wharton, TX — Electric Reliability Council of Texas, Inc.
10 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2019
Operating Since
Coordinates
29.2059, -96.0274
County
Wharton, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Cypress Creek Renewables | Cypress Creek Renewables | — |
| Owner(s) | Cypress Creek Renewables | — | — |
| Status | Operating | operating | — |
Cascade Solar is a 10 MW solar photovoltaic power plant located in Wharton County, Texas. The plant began operating in 2019 and has one generator. It is owned and operated by Cypress Creek Renewables. The facility utilizes single-axis tracking technology to maximize solar energy capture. Cascade Solar operates within the Electric Reliability Council of Texas (ERCOT) balancing authority.
In its most recent year of operation, Cascade Solar generated 17,265 MWh of electricity, achieving a capacity factor of 19.7%. The plant is ranked 245th out of 298 power plants in Texas and 1854th out of 7108 plants nationally. Financial data is available for the plant from LBNL Solar.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
12.47 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
962 MWh
Latest Month
17.3K MWh
Annual Generation
19.7%
Capacity Factor
$46.4/MWh
LCOE (Levelized Cost)
$19.8/MWh
Energy Value
Point of Interconnection
Nearest Substation
South Lane City Substation · 138 kV
Substation Distance
< 10 km
Operator
CenterPoint Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_HOUSTON
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
Amazon Backs Washington State Multi-Unit Modular Reactor
A regional utility plan to build a small modular nuclear reactor in southeast Washington has now gained financial backing from Amazon.
A first look at the Amazon-backed, next-generation nuclear facility planned for Washington state
A project to build one of the nation's first next-gen nuclear facilities has just announced its name — the Cascade Advanced Energy Facility...
Amazon updates SMR progress, with new images of proposed plant
Amazon has released a series of images of how its planned X-energy small modular reactor plant - to be named the Cascade Advanced Energy...
Amazon Unveils ‘Cascade’—Energy Northwest’s Xe-100 SMR Project, Targeting Construction by 2030
Amazon has unveiled detailed plans and renderings for the Cascade Advanced Energy Facility, an initial 320-MW small modular reactor (SMR)...
Last updated 2026-03-14
View all 10 articles