10 MW BESS out of service in Maricopa, AZ — Salt River Project
10 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2019
Operating Since
Coordinates
33.4468, -111.9563
County
Maricopa, AZ
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | AES ES GILBERT, LLC | — | — |
| Owner(s) | AES ES GILBERT, LLC | — | — |
| Status | Out of service | — | — |
The AES ES GILBERT facility is a 10 MW battery energy storage system (BESS) located in Maricopa County, Arizona. The plant began operating in 2019 and is owned and operated by AES ES GILBERT, LLC. It consists of a single generator utilizing lithium-ion battery (LIB) chemistry. The BESS has a total storage capacity of 40 MWh, providing a duration of 4 hours at its full power rating.
The facility interconnects to the Salt River Project balancing authority within the Western Electricity Coordinating Council (WECC) NERC region. According to available data, the plant ranks 68th out of 68 power plants in Arizona and 770th out of 1205 nationally. Financial data indicates a power purchase agreement (PPA) price of $7 per MWh, as reported in FERC Electric Quarterly Reports (EQR). The plant's primary fuel is listed as MWH, indicating it draws power from the grid to charge its batteries.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
Salt River Project
Grid Voltage
12.47 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
0 MWh
Net Discharge
0 MWh
Annual Net Energy
0.0%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
$7.0/MWh
PPA Price
AES ES Gilbert, LLC
Contract Seller
Per-Unit Cost Trends
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.
AES investigating cause of "thermal runaway" at Arizona site
Power company AES Corporation is investigating the cause of what has been described as a thermal runaway incident at a 10MW battery energy storage system (BESS...
Cause of battery storage fire in Arizona under investigation
AES said it plans to investigate the cause of a smoldering fire at one of its lithium battery storage facilities in Chandler, Arizona.
Last updated 2026-03-15
View all articles