10 MW Solar operating in Lamar, TX — Electric Reliability Council of Texas, Inc.
10 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2018
Operating Since
Coordinates
33.6271, -95.3868
County
Lamar, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Cypress Creek Renewables | Cypress Creek Renewables | — |
| Owner(s) | Cypress Creek Renewables | — | — |
| Status | Operating | operating | — |
The Chisum solar photovoltaic plant is located in Lamar County, Texas. The plant has a total capacity of 10 MW and began operating in 2018. It consists of a single generator utilizing fixed-tilt solar tracking technology. Cypress Creek Renewables is the owner and operator. The plant's primary fuel source is solar energy.
Chisum operates within the Electric Reliability Council of Texas (ERCOT) balancing authority. In the most recent year with available data, the plant generated 20,684 MWh, achieving a capacity factor of 23.5%. Chisum is ranked as the 248th largest solar plant in Texas out of 298, and 1855th nationally out of 7108. Financial data is available for the plant from LBNL, but specific metrics are not provided.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
22 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
822 MWh
Latest Month
20.7K MWh
Annual Generation
23.5%
Capacity Factor
$47.5/MWh
LCOE (Levelized Cost)
$18.4/MWh
Energy Value
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_NORTH
Node Source
OSM spatial match
Last updated 2026-03-14
View all 7 articles