5 MW Solar operating in Caddo, OK — Southwest Power Pool
5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2017
Operating Since
Coordinates
34.8959, -98.2272
County
Caddo, OK
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Western Farmers Elec Coop, Inc | Western Farmers Electric Cooperative | — |
| Owner(s) | Western Farmers Elec Coop, Inc | — | — |
| Status | Operating | operating | — |
The Cyril solar photovoltaic plant is located in Caddo County, Oklahoma. The plant has a total capacity of 5 MW and began operating in 2017. It is owned and operated by Western Farmers Electric Cooperative, Inc. The facility consists of a single generator utilizing single-axis tracking technology. Cyril is interconnected to the Southwest Power Pool (SPP) balancing authority and resides within the Midcontinent Reliability Organization (MRO) NERC region.
In the most recent year of data, Cyril generated 8,459 MWh of electricity, achieving a capacity factor of 19.3%. Cyril is ranked as the 12th largest solar plant out of 22 in Oklahoma, and 2260th nationally out of 7108 plants. Financial data is available for the plant from LBNL, though specific figures are not provided.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Southwest Power Pool
Grid Voltage
24.6 kV
Regulatory Status
RE
Entity Type
Cooperative
Sector
Electric Utility
322 MWh
Latest Month
8.5K MWh
Annual Generation
19.3%
Capacity Factor
$57.1/MWh
LCOE (Levelized Cost)
$35.5/MWh
Energy Value
Market Position
ISO/RTO Market
SPP
LMP Node
—
Pricing Hub
SPP South Hub
Node Source
OSM spatial match
Red Flag Warning: Grant; Kay; Garfield; Noble; Blaine; Kingfisher; Logan; Payne; Caddo; Canadian; Oklahoma; Lincoln; G
Red Flag Warning issued March 21 at 12:09PM CDT until March 22 at 9:00PM CDT by NWS Norman OK
Last updated 2026-03-21
View all articles