2.3 MW Solar operating in Middlesex, MA — ISO New England Inc.
2.3 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2016
Operating Since
Coordinates
42.2602, -71.5014
County
Middlesex, MA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Ameresco, Inc - GELD | Ameresco | — |
| Owner(s) | Ameresco, Inc - GELD | — | — |
| Status | Operating | operating | — |
GELD Solar Farm is a 2.3 MW solar photovoltaic power plant located in Middlesex County, Massachusetts. The plant began operating in 2016 and is owned and operated by Ameresco, Inc - GELD. It consists of a single generator utilizing fixed-tilt solar tracking technology. GELD Solar Farm is connected to the ISO New England Inc. balancing authority and is within the Northeast Power Coordinating Council (NPCC) NERC region.
In its most recent year of operation, GELD Solar Farm generated 3,481 MWh of electricity, achieving a capacity factor of 17.2%. The plant ranks as the 198th largest solar facility in Massachusetts out of 435, and 4401st nationally out of 7108. The plant's primary fuel source is solar energy.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
ISO New England Inc.
Grid Voltage
13.8 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
160 MWh
Latest Month
3.5K MWh
Annual Generation
17.2%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
West Framingham Substation · 115 kV
Substation Distance
4.295 km
Operator
Eversource
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
LD.W_FRMHAM13.8
Pricing Hub
.H.INTERNAL_HUB
Node Source
Curated node match