10 MW Solar operating in Hunt, TX — Electric Reliability Council of Texas, Inc.
10 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2017
Operating Since
Coordinates
33.1615, -96.2394
County
Hunt, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Cypress Creek Renewables | Cypress Creek Renewables | — |
| Owner(s) | Cypress Creek Renewables | — | — |
| Status | Operating | operating | — |
Leon Solar is a 10 MW solar photovoltaic power plant located in Hunt County, Texas. The plant began operating in 2017 and has a single generator utilizing single-axis tracking. It is owned and operated by Cypress Creek Renewables. Leon Solar is interconnected to the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority.
The plant's latest annual generation was 19,908 MWh, resulting in a capacity factor of 22.7%. Leon Solar ranks as the 249th largest solar plant in Texas out of 298, and 1895th nationally out of 7108. Financial data is available for the plant from LBNL Solar.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
24.9 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
882 MWh
Latest Month
19.9K MWh
Annual Generation
22.7%
Capacity Factor
$47.5/MWh
LCOE (Levelized Cost)
$21.5/MWh
Energy Value
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_NORTH
Node Source
OSM spatial match
Automation and the Future of Solar Field Construction
With increasing demands on the energy grid, renewable energy projects are moving forward, and new technologies are transforming the way they...
Full commercial operation achieved at Zelestra?s Villamañán solar plant in León, Spain
Renewable energy company Zelestra has announced the start of full commercial operations at the 19 MWdc Villamañán solar project in León,...
Zelestra Begins Full Commercial Operations At The Villamañán Solar Project, A 19 MWdc Facility In León, Strengthening Clean Energy Capacity In Spain
Zelestra, a global multi-technology renewable energy company, has begun full commercial operations at the Villamañán Solar Project,...
MAP: Power outage in Leon Valley affecting nearly 4,000 CPS Energy customers
A power outage in Leon Valley is affecting nearly 4000 CPS Energy customers, according to the utility's outage map.
Last updated 2026-03-26