10.2 MW Solar operating in Lexington, SC — Dominion Energy South Carolina
10.2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2018
Operating Since
Coordinates
33.7740, -81.1098
County
Lexington, SC
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Cypress Creek Renewables | Cypress Creek Renewables | — |
| Owner(s) | Cypress Creek Renewables | — | — |
| Status | Operating | operating | — |
Gaston Solar I - SC is a 10.2 MW solar photovoltaic power plant located in Lexington County, South Carolina. The plant began operating in 2018 and has one generator. It is owned and operated by Cypress Creek Renewables. The primary fuel source is solar energy. Gaston Solar I - SC is ranked 50th out of 143 solar plants in South Carolina and 1792nd out of 7108 solar plants nationally.
The plant's latest annual generation was 16,593 MWh, resulting in a capacity factor of 18.5%. The solar tracking technology used is fixed tilt. Gaston Solar I - SC operates within the Dominion Energy South Carolina balancing authority and the SERC NERC region. Financial data is available for the plant from LBNL, though specific figures are not provided.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Dominion Energy South Carolina
Grid Voltage
23.9 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
830 MWh
Latest Month
16.6K MWh
Annual Generation
18.5%
Capacity Factor
$52.2/MWh
LCOE (Levelized Cost)
$29.8/MWh
Energy Value
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.
Duke Energy Brings New Grid Battery On Line at Former Allen Coal Plant
Duke Energy has brought on line a 50-megawatt, four-hour battery energy storage system at its former Allen coal plant on Lake Wylie,...
Duke Energy Brings New Grid Battery On Line at Former Allen Coal Plant
Duke Energy has brought on line a 50-megawatt, four-hour battery energy storage system at its former Allen coal plant on Lake Wylie,...
Duke Energy Brings New Grid Battery On Line at Former Allen Coal Plant
Duke Energy has brought on line a 50-megawatt, four-hour battery energy storage system at its former Allen coal plant on Lake Wylie,...
Duke Energy Brings New Grid Battery On Line at Former Allen Coal Plant
Duke Energy has brought on line a 50-megawatt, four-hour battery energy storage system at its former Allen coal plant on Lake Wylie,...
Last updated 2026-03-26
View all 10 articles