5 MW Solar operating in Chisago, MN — Midcontinent Independent Transmission System Operator, Inc..
5 MW
Nameplate Capacity
5
Generators
units
Solar Photovoltaic
Technology
2018
Operating Since
Coordinates
45.3271, -92.9346
County
Chisago, MN
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Ecoplexus, Inc | Ecoplexus | — |
| Owner(s) | Ecoplexus, Inc | — | — |
| Status | Operating | operating | — |
Wyoming 2 CSG, LLC is a 5 MW solar photovoltaic power plant located in Chisago County, Minnesota. The plant, which began operating in 2018, consists of 5 generators utilizing fixed-tilt solar tracking technology. It is owned and operated by Ecoplexus, Inc. The plant is interconnected to the Midcontinent Independent Transmission System Operator, Inc. (MISO) and falls within the MRO NERC region.
In its most recent year of operation, Wyoming 2 CSG, LLC generated 8,165 MWh of electricity, achieving a capacity factor of 18.6%. The plant ranks 46th out of 540 power plants in Minnesota and 2468th out of 7108 plants nationally.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
12.5 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
169 MWh
Latest Month
8.2K MWh
Annual Generation
18.6%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Wyoming Substation · 115 kV
Substation Distance
< 10 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MINN.HUB
Node Source
OSM spatial match