3 MW Solar operating in McLeod, MN — Midcontinent Independent Transmission System Operator, Inc..
3 MW
Nameplate Capacity
3
Generators
units
Solar Photovoltaic
Technology
2017
Operating Since
Coordinates
44.9453, -94.0823
County
McLeod, MN
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Minnesota Solar CSG 4, LLC | Minnesota Solar CSG 4 | — |
| Owner(s) | Minnesota Solar CSG 4, LLC | — | — |
| Status | Operating | operating | — |
Montgomery Winsted CSG is a 3 MW solar photovoltaic power plant located in McLeod County, Minnesota. The plant began operating in 2017 and is owned and operated by Minnesota Solar CSG 4, LLC. It consists of three generators utilizing fixed-tilt solar tracking technology. The plant's primary fuel source is solar energy.
In its most recent year of operation, Montgomery Winsted CSG generated 5,134 MWh of electricity, achieving a capacity factor of 19.5%. The plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the Midwest Reliability Organization (MRO) NERC region. In terms of size, Montgomery Winsted CSG ranks as the 152nd largest solar plant in Minnesota out of 540, and 4032nd nationally out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
13.8 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
142 MWh
Latest Month
5.1K MWh
Annual Generation
19.5%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MINN.HUB
Node Source
OSM spatial match