10 MW Solar operating in Klamath, OR — PacifiCorp - West
10 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2018
Operating Since
Coordinates
42.2389, -121.5858
County
Klamath, OR
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Heelstone Energy Holdings, LLC | Heelstone Energy Holdings | — |
| Owner(s) | Heelstone Energy Holdings, LLC | — | — |
| Status | Operating | operating | — |
OR Solar 8, LLC is a 10 MW solar photovoltaic power plant located in Klamath County, Oregon. The plant began operating in 2018 and has one generator. It is owned and operated by Heelstone Energy Holdings, LLC. The facility utilizes single-axis tracking to maximize solar energy capture. OR Solar 8 is ranked as the 29th largest solar plant in Oregon out of 147, and 1860th nationally out of 7108.
The plant's latest annual generation was 20,989 MWh, resulting in a capacity factor of 23.9%. OR Solar 8 operates within the PacifiCorp - West balancing authority and is part of the Western Electricity Coordinating Council (WECC) NERC region. Financial data is available for the plant from LBNL, though specific figures are not provided.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
PacifiCorp - West
Grid Voltage
12 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
532 MWh
Latest Month
21.0K MWh
Annual Generation
23.9%
Capacity Factor
$46.7/MWh
LCOE (Levelized Cost)
$26.6/MWh
Energy Value
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.
2 new Oregon solar projects deliver energy to PGE, Intel
Avangrid's Daybreak and Bakeoven solar plants in Wasco County have generated power since 2024, with Intel receiving electricity via PGE this...
2 new Oregon solar projects deliver energy to PGE, Intel
Avangrid's Daybreak and Bakeoven solar plants in Wasco County have generated power since 2024, with Intel receiving electricity via PGE this...
2 new Oregon solar projects deliver energy to PGE, Intel
Avangrid's Daybreak and Bakeoven solar plants in Wasco County have generated power since 2024, with Intel receiving electricity via PGE this...
2 new Oregon solar projects deliver energy to PGE, Intel
Avangrid's Daybreak and Bakeoven solar plants in Wasco County have generated power since 2024, with Intel receiving electricity via PGE this...
Last updated 2026-03-26
View all 10 articles