15 MW Solar operating in Frederick, MD — PJM Interconnection, LLC
15 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2025
Operating Since
Coordinates
44.6738, -121.1229
County
Frederick, MD
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Biggs Ford Solar Center, LLC | Biggs Ford Solar Center | — |
| Owner(s) | Biggs Ford Solar Center, LLC | — | — |
| Status | Operating | operating | — |
Biggs Ford Solar Center is a 15 MW solar photovoltaic power plant located in Frederick County, Maryland. The plant began operating in 2025 and is owned and operated by Biggs Ford Solar Center, LLC. The facility utilizes fixed-tilt solar tracking technology.
The plant is connected to the PJM Interconnection, LLC balancing authority and operates within the RFC NERC region. Biggs Ford Solar Center is ranked as the 15th largest solar facility in Maryland out of 183, and nationally it is ranked 1,667 out of 7,108. The plant consists of one generator.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
34.5 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Biggs Ford Solar Facility
No generation data available for this plant.
No financial data available for this plant.
Market Position
ISO/RTO Market
PJM
LMP Node
WALKERSV138 KV T1
Pricing Hub
WESTERN HUB
Location Type
Load Node
Node Source
Curated node match
US solar set to surpass wind in 2025, overtake coal by 2028
US Federal Energy Regulatory Commission (FERC) figures show solar developers adding 16 GW through July 2025, nearly three-quarters of new...
U.S. solar will pass wind in 2025 and leave coal in the dust soon after
Solar and wind represent about 11% to 12% of the energy mix each, while coal sits just under 15%. Developers brought online 16 GW of solar...
State Supreme Court Upholds State Preemption on Solar Siting
Earlier this month the Supreme Court of Maryland upheld state preemption on solar siting over local zoning policy.
Last updated 2026-03-14
View all articlesLegore Bridge Solar Center Facility