22.9 MW Natural Gas Fired Combustion Turbine (8 MW) + Petroleum Liquids (15 MW) standby in New York, NY — New York Independent System Operator
22.9 MW
Nameplate Capacity
10
Generators
units
Hybrid (2)
Technology
Natural Gas Fired Combustion Turbine + Petroleum Liquids
1997
Operating Since
Coordinates
40.7644, -73.9539
County
New York, NY
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | NY - PRESBYTERIAN HOSPITAL- 68TH ST | — | — |
| Owner(s) | NY - PRESBYTERIAN HOSPITAL- 68TH ST | — | — |
| Status | Standby | — | — |
The New York Presbyterian Hospital- 68th Street power plant is located in New York County, New York. The plant has a total capacity of 22.9 MW across 10 generators. It began operating in 1997 and is operated by NY - PRESBYTERIAN HOSPITAL- 68TH ST. The primary fuel source is DFO (distillate fuel oil), but the plant also utilizes natural gas fired combustion turbine technology and is considered a hybrid plant.
In the most recent year with available data, the plant generated 54,018 MWh, resulting in a capacity factor of 26.8%. The New York Presbyterian Hospital- 68th Street plant operates within the New York Independent System Operator (NYISO) balancing authority and the NPCC NERC region. Based on its capacity, it is ranked 8th out of 66 similar plants in New York state and 173rd out of 886 nationally.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
New York Independent System Operator
Grid Voltage
4.16 kV
Regulatory Status
NR
Entity Type
Commercial
Sector
Commercial CHP
4.8K MWh
Latest Month
54.0K MWh
Annual Generation
26.8%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
NYPA_VERNON_____GT2
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NYISO Zone J
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
The 2025 Westchester Power 100
Westchester County doesn't fit neatly into simple categories. Known for its leafy residential communities, it's also where several Fortune...
The 2025 Manhattan Power 100
It's a time of transition for Manhattan's political class. The borough president is likely moving up to become New York City comptroller,...
The 2025 Brooklyn Power 100
A lot has changed since New York City Mayor Eric Adams declared himself the “Biden of Brooklyn” in early 2022.
NewYork-Presbyterian Hospital Takes 10K SF at Simone’s Bronx Medical Building
NewYork-Presbyterian Hospital has signed a 10189-square-foot lease at Simone Development Companies' 2510 Westchester Avenue.
Last updated 2026-03-14
View all 10 articles