2.5 MW Solar operating in Livingston, MO — Southwest Power Pool
2.5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2017
Operating Since
Coordinates
39.7884, -93.5364
County
Livingston, MO
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Missouri Jnt Muni.Pwr Elec. Ut. Comm. | MC Power Companies | — |
| Owner(s) | MPUA | MPUA [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as MPUA [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
Chillicothe Solar Farm is a 2.5 MW solar photovoltaic power plant located in Livingston County, Missouri. The plant began operating in 2017 and has one generator. It is owned and operated by Missouri Joint Municipal Power Electric Utility Commission. The plant utilizes a fixed-tilt solar tracking system.
The Chillicothe Solar Farm is interconnected to the Southwest Power Pool (SPP) balancing authority and resides within the SERC NERC region. In the state of Missouri, the plant ranks 30th out of 36 solar facilities. Nationally, it is ranked 4297 out of 7108. In the most recent year of data, the plant generated 4,358 MWh of electricity, achieving a capacity factor of 19.9%.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Southwest Power Pool
Grid Voltage
12.47 kV
Regulatory Status
NR
Entity Type
Political Subdivision
Sector
IPP Non-CHP
195 MWh
Latest Month
4.4K MWh
Annual Generation
19.9%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
SPP
LMP Node
MO.AE.CHIL2.MP
Pricing Hub
SPP South Hub
Secondary Zone
SPP North Hub
Node Source
Curated node match