325 MW Batteries (125 MW) + Solar Photovoltaic (200 MW) under construction in San Bernardino, CA — California Independent System Operator
325 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
—
Operating Since
Coordinates
34.9880, -117.5716
County
San Bernardino, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | 91MC 8me LLC | — | — |
| Owner(s) | 91MC 8me LLC | — | — |
| Status | Under construction | construction | — |
Aratina Solar Center 1B is a 325 MW hybrid power plant located in San Bernardino County, California. The facility, identified by plant ID 61167, is owned and operated by 91MC 8me LLC. The plant utilizes both solar photovoltaic technology and batteries, with electricity designated as its primary fuel type. It consists of two generators employing fixed-tilt solar tracking.
The plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. Aratina Solar Center 1B holds the rank of 28th largest among 112 power plants in California and 126th nationally out of 514 plants. The plant has been the subject of 10 news articles, with coverage focusing on regulatory matters (7 articles), deals (2 articles), and industry news (1 article).
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
220 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Segs 7
Substation Distance
2.643 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
SUNGEN_1_B1
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
Solar project stirs dust-up in Boron
The community of Boron in eastern Kern County is a little dusty to start with, as close as it is to a large open-pit mine,...
US renewables and battery storage developers Avantus, Arevon, and Clearway secure financing
Avantus has closed more than US$500 million 200MW/500MWh Aratina 1 battery energy storage system (BESS) project in Kern County, California.
Stop Aratina Solar Project Rally held in Boron | News | desertnews.com
BORON – A handful of Boron residents turned out for a rally to protest the building of a solar farm just outside their backyard,...
As crews chainsaw Joshua trees, Mojave Desert community protests solar energy project
Tree-cutting crews working for Avantus arrived in late August. The company is building the Aratina Solar Center.
Last updated 2026-03-14