1 MW Solar operating in San Joaquin, CA — California Independent System Operator
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2017
Operating Since
Coordinates
37.8402, -121.2153
County
San Joaquin, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | AES Distributed Energy | AES Distributed Energy | — |
| Owner(s) | AES Distributed Energy | — | — |
| Status | Operating | operating | — |
Manteca Land PV is a 1 MW solar photovoltaic power plant located in San Joaquin County, California. The plant began operating in 2017 and has one generator. It is owned and operated by AES Distributed Energy. The primary fuel source is solar energy.
The plant's latest annual generation was 1,603 MWh, resulting in a capacity factor of 18.2%. The solar panels utilize a fixed-tilt tracking system. Manteca Land PV operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. In terms of size, the plant ranks 830 out of 862 solar plants in California and 6821 out of 7108 nationally.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
17 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
65 MWh
Latest Month
1.6K MWh
Annual Generation
18.2%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
CAISO
LMP Node
VIERRA_1_N001
Pricing Hub
TH_NP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match