2 MW Solar operating in Cayuga, NY — New York Independent System Operator
2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2016
Operating Since
Coordinates
42.7318, -76.6649
County
Cayuga, NY
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Artemis Solar LLC | Artemis Solar | — |
| Owner(s) | Artemis Solar LLC | — | — |
| Status | Operating | operating | — |
Musgrave East Solar Farm is a 2 MW solar photovoltaic power plant located in Cayuga County, New York. The plant began operating in 2016 and has one generator. Artemis Solar LLC is the owner and operator. The plant utilizes fixed tilt solar tracking technology.
The facility's latest annual generation was 2,781 MWh, resulting in a capacity factor of 15.8%. Musgrave East Solar Farm is interconnected to the New York Independent System Operator (NYISO) balancing authority and is within the Northeast Power Coordinating Council (NPCC) NERC region. The plant ranks 581 out of 695 power plants in New York and 5302 out of 7108 nationally.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
New York Independent System Operator
Grid Voltage
0.48 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
85 MWh
Latest Month
2.8K MWh
Annual Generation
15.8%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NYISO Zone B
Node Source
Plant coordinates only