3 MW Solar operating in Le Sueur, MN — Midcontinent Independent Transmission System Operator, Inc..
3 MW
Nameplate Capacity
3
Generators
units
Solar Photovoltaic
Technology
2018
Operating Since
Coordinates
44.3172, -93.8976
County
Le Sueur, MN
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Terraform Arcadia | — | — |
| Owner(s) | Terraform Arcadia | — | — |
| Status | Operating | operating | — |
Red Maple Solar is a 3 MW solar photovoltaic power plant located in Le Sueur County, Minnesota. The plant began operating in 2018 and is owned and operated by Terraform Arcadia. It consists of 3 generators utilizing single-axis tracking technology to maximize solar energy capture. Red Maple Solar is interconnected to the Midcontinent Independent Transmission System Operator (MISO) balancing authority, within the broader NERC MRO region.
In its most recent year of operation, Red Maple Solar generated 5,101 MWh of electricity, achieving a capacity factor of 19.4%. The plant's relatively small size places it as the 133rd largest solar facility in Minnesota out of 540, and 3869th nationally out of 7108. The plant's primary fuel source is solar energy (SUN).
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
0.48 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
116 MWh
Latest Month
5.1K MWh
Annual Generation
19.4%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MINN.HUB
Node Source
OSM spatial match