1000 MW Natural Gas operating in Montgomery, TX — Midcontinent Independent Transmission System Operator, Inc..
1,000 MW
Nameplate Capacity
3
Generators
units
Natural Gas Fired Combined Cycle
Technology
2021
Operating Since
Coordinates
30.4406, -95.5263
County
Montgomery, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Entergy Texas Inc. | Entergy Texas | — |
| Owner(s) | Entergy Texas Inc. | Entergy | — |
| Status | Operating | — | — |
The Montgomery County power plant is a 1,000 MW natural gas-fired combined cycle facility located in Montgomery County, Texas. The plant began operating in 2021 and is owned by Entergy and operated by Entergy Texas Inc. It consists of 3 generators utilizing natural gas. The plant operates within the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and the SERC NERC region.
Montgomery County's latest annual generation was 5,870,260 MWh, achieving a capacity factor of 73.0%. The plant ranks as the 24th largest in Texas out of 144 plants, and 171st nationally out of 945 plants. The installed cost was $705 per kW, according to FERC data.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
230 kV
Regulatory Status
RE
Entity Type
Investor-Owned Utility
Sector
Electric Utility
492.0K MWh
Latest Month
5.9M MWh
Annual Generation
73.0%
Capacity Factor
$735/kW
Installed Cost
$19.2/MWh
Operating Cost
Entergy Texas, Inc.
Reporting Utility
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Point of Interconnection
Nearest Substation
Lacon Substation · 138 kV
Substation Distance
0.969 km
Operator
Entergy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
EES.L_CREEK1
Pricing Hub
TEXAS.HUB
Location Type
Generation Node
Node Source
Curated node match
Montgomery County to mount legal challenge to large-scale solar permits
FONDA — Montgomery County will mount a legal challenge against the state siting permit issued for the 250-megawatt Mill Point Solar I...
The career that keeps Southeast Texas moving
Montgomery County Power Station control room operator Scott Nichols. Every time a refinery starts up, a hospital powers critical equipment...
Massive solar project approved in Glen, local leaders warn of long-term economic losses
New York just approved a massive 2666 acre solar project in Glen in Montgomery County, but local leaders fear the town will lose far more...
NYS approves renewable energy project in Montgomery County
The New York State Department of Public Service (DPS) has issued a final siting permit for a solar facility in the town of Glen.
Last updated 2026-03-26
View all 10 articles