163 MW Wind operating in Randall, TX — Electric Reliability Council of Texas, Inc.
163 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2017
Operating Since
Coordinates
34.7772, -102.0541
County
Randall, TX
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Astra Wind LLC | General Electric | — |
| Owner(s) | Astra Wind LLC | Falvez Energy LLC [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as Falvez Energy LLC [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
Astra Wind Farm is a 163 MW wind power plant located in Randall County, Texas. The facility began operating in 2017 and is owned and operated by Astra Wind LLC. The plant utilizes a single generator consisting of multiple onshore wind turbines. It is interconnected to the Electric Reliability Council of Texas (ERCOT) grid, and falls within the Texas Reliability Entity (TRE) NERC region.
The wind farm's turbines have a hub height of 80 meters and a rotor diameter of 107 meters. The turbines were manufactured by GE Wind, model GE2.4-107. In its most recent year of operation, Astra Wind Farm generated 530,298 MWh of electricity, achieving a capacity factor of 37.1%. Astra Wind Farm ranks as the 140th largest power plant in Texas out of 200, and 437th nationally out of 734.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
345 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
48.9K MWh
Latest Month
530.3K MWh
Annual Generation
37.1%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
ERCOT
LMP Node
HERFWIND_ALL
Pricing Hub
HB_WEST
Node Source
EIA-860 direct report
Red Flag Warning: Cimarron; Texas; Beaver; Dallam; Sherman; Hansford; Ochiltree; Lipscomb; Hartley; Moore; Hutchinson;
Red Flag Warning issued March 21 at 12:30PM CDT until March 21 at 8:00PM CDT by NWS Amarillo TX
Red Flag Warning: Cimarron; Texas; Beaver; Dallam; Sherman; Hansford; Ochiltree; Lipscomb; Hartley; Moore; Hutchinson;
Red Flag Warning issued March 21 at 12:30PM CDT until March 22 at 9:00PM CDT by NWS Amarillo TX
A Mighty Wind
Giant turbines topped by aerodynamic blades account for a rising share of the state's electrical grid––and may change the way people look at green energy (and...
Alborz LLC, a Joint Venture Affiliate of Cipher Mining Inc., Enters Into $46.9 Million Financing with BlockFi Lending LLC
It has entered into a two-year $46.9 million secured credit facility with BlockFi Lending LLC, a leading crypto financial services company.
Last updated 2026-03-21