1 MW Solar operating in Pima, AZ — Tucson Electric Power Company
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2016
Operating Since
Coordinates
32.2701, -110.9739
County
Pima, AZ
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Luminace Solar Arizona 2, LLC | Luminace Solar Arizona 2 | — |
| Owner(s) | Luminace Solar Arizona 2, LLC | — | — |
| Status | Operating | operating | — |
Amphitheater High School Solar is a 1 MW solar photovoltaic power plant located in Pima County, Arizona. The plant began operating in 2016 and has a single generator. It is owned and operated by Luminace Solar Arizona 2, LLC. The plant's primary fuel source is solar energy.
The plant operates within the Tucson Electric Power Company balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. In terms of size, Amphitheater High School Solar ranks 93rd out of 93 solar plants in Arizona and 6661st out of 7108 solar plants nationally. The plant's latest annual generation was 1,833 MWh, resulting in a capacity factor of 20.9%. The solar panels utilize a fixed tilt tracking system.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
Tucson Electric Power Company
Grid Voltage
13.8 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
112 MWh
Latest Month
1.8K MWh
Annual Generation
20.9%
Capacity Factor
No financial data available for this plant.
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.