5.2 MW Solar operating in Bladen, NC — Duke Energy Carolinas
5.2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2016
Operating Since
Coordinates
34.8229, -78.6243
County
Bladen, NC
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Cypress Creek Renewables | Cypress Creek Renewables | — |
| Owner(s) | Cypress Creek Renewables | — | — |
| Status | Operating | operating | — |
CB Bladen Solar, LLC is a 5.2 MW solar photovoltaic power plant located in Bladen County, North Carolina. The plant began operating in 2016 and has one generator. It is owned and operated by Cypress Creek Renewables. The plant's primary fuel source is solar energy. CB Bladen Solar is connected to the Duke Energy Carolinas balancing authority and is within the SERC NERC region.
In its most recent year of operation, CB Bladen Solar generated 9,519 MWh of electricity, achieving a capacity factor of 20.8%. The plant utilizes fixed-tilt solar tracking technology. CB Bladen Solar ranks as the 140th largest solar plant in North Carolina out of 770, and nationally it ranks 2204 out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Duke Energy Carolinas
Grid Voltage
12.47 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
602 MWh
Latest Month
9.5K MWh
Annual Generation
20.8%
Capacity Factor
No financial data available for this plant.
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.