5.2 MW Solar operating in Alamance, NC — Duke Energy Progress East
5.2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2016
Operating Since
Coordinates
35.8639, -79.4254
County
Alamance, NC
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Cypress Creek Renewables | Cypress Creek Renewables | — |
| Owner(s) | Cypress Creek Renewables | — | — |
| Status | Operating | operating | — |
Snow Camp Solar, LLC is a 5.2 MW solar photovoltaic power plant located in Alamance County, North Carolina. The plant began operating in 2016 and is owned and operated by Cypress Creek Renewables. It utilizes a single generator and fixed-tilt solar tracking technology. The plant is located within the Duke Energy Progress East balancing authority and the SERC NERC region.
In its most recent year of operation, Snow Camp Solar generated 11,101 MWh of electricity, achieving a capacity factor of 24.3%. The plant is ranked 135th out of 770 solar facilities in North Carolina, and 2190th nationally out of 7108 plants. Financial data for the plant is available from LBNL, indicating it is part of a broader study of solar power economics.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Duke Energy Progress East
Grid Voltage
12.47 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
590 MWh
Latest Month
11.1K MWh
Annual Generation
24.3%
Capacity Factor
$69.9/MWh
LCOE (Levelized Cost)
$20.4/MWh
Energy Value
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.